
We Make It Easy to Find a Remodeling Contractor in Scarborough, Maine
Many houses in this town were built between 1995 and 2005. They're all hitting the same birthday at once.
A remodeling contractor in Scarborough, ME who understands what fails at thirty years will price the whole house, not only the kitchen. We'll line up three.

- 100% free for homeowners
- Same-day response before 5pm
- 10-step contractor vetting
Scarborough grew fast, and a lot of it went up between 1995 and 2005. Those houses are all turning thirty at once, which means dated kitchens, fogged window seals and a two-story great room that never heats evenly. This page covers hiring a remodeling contractor who reads the whole house, not just one room.
Size drives the money here. In a 2,800 square foot subdivision house, flooring, trim and island counters are quantity decisions, so two honest quotes can differ by tens of thousands. The gap usually lives in the allowance schedule, which is why you want it in writing, line by line.
Maine sets no statewide requirement for general contractors, so a ten-step screening covering insurance, references, work history and financial stability stands in for one. It is a snapshot, never a guarantee. Three contractors quote the same scope, and the introduction costs you nothing.

How does a big footprint change the budget?
Scale matters too. Scarborough's subdivision houses are large, and square footage changes which choices drive the budget.
Labor and unknown conditions dominate in a small older house. In a 2,800 square foot house from 1998, selections dominate. Flooring across an open first floor adds up quickly.
So does trim through many rooms. A kitchen with a big island multiplies every per-unit choice.
That's why two Scarborough quotes for the same project can differ by tens of thousands without either being unreasonable. The difference sits in the allowance schedule.
Ask for it in writing, line by line. Compare those figures instead of the totals at the bottom.
Partial scope is often the right call here. Doing the kitchen and main bath properly usually beats spreading the budget across four areas at a finish level you dislike.
A contractor worth hiring will say so, even if it costs them work.
The coastal pockets are a separate market. Higgins Beach and Pine Point have older, smaller cottages.
Prouts Neck does too, and all three sit much closer to salt air. A cottage there behaves nothing like an Oak Hill subdivision house.
Near the water, expect more unknowns and price a real contingency. Confirm exterior work or an addition with Town of Scarborough code enforcement early.
Shoreland rules cover more of the town than people assume.
- 250+projects completed
- 8+years serving Maine
- 1 weekaverage to your first quote
- $0cost to you, the homeowner
Ready for three quotes on your Scarborough remodel?
Tell us what you want remodeled. Three vetted remodelers come back with real numbers.
How much does remodeling cost in Scarborough, ME?
Ranges come from recent quotes across our network.
| Project | Range | Timeline |
|---|---|---|
| Bathroom remodel (per bathroom) | $12,000 – $35,000 | 3 – 6 weeks |
| Kitchen remodel | $14,500 – $77,500+ | 5 – 10 weeks |
| Basement finish | $30,000 – $90,000 | 4 – 9 weeks |
| Multi-room or whole-home renovation | $120,000 – $300,000+ | 12 – 24 weeks |
A GC's fee is usually 10% to 20% of the project cost.
Subdivision projects here tend to land in the middle or upper range because of size, not difficulty. A large open first floor simply requires a lot of flooring and trim.
Basements are often the best value in this housing stock. Many were framed and insulated, then left unfinished.
The headroom may already be there, along with an egress window. When it is, a basement finish adds genuinely cheap square footage.
Other services in Scarborough
What other towns do we cover near Scarborough?
Scarborough
What does a 1990s house need at thirty?
Scarborough grew faster than anywhere else in the region, with most of that growth concentrated in subdivisions from a narrow building window. The houses were well built within a budget.
Thirty years later, the budget parts start coming due.
The kitchen is dated rather than broken. Original builder-grade cabinet boxes are often structurally fine with doors and finishes that have had it. That opens a real choice: replace the boxes, or reface and put the money into counters and appliances. On a house of this era refacing is a legitimate option rather than a compromise, and it is worth pricing both ways.
Windows are at end of life. Failed seals, fogged glass, tired vinyl. Not urgent individually, expensive as a set, and much cheaper to address while trim and drywall are already open.
The great room is a heating problem. Two-story volumes were the look of that decade. They stratify, so the loft is hot and the floor is cold. Once ceilings are open, that is the moment to fix air sealing and think about where the heat is delivered.
Baths are small and the primary suite is not what people expect now. Reworking an ensuite in this stock is common and usually straightforward, because the plumbing is modern enough to move without discovering something alarming.
Systems are at the age where they get replaced. Water heaters, furnaces and air handlers from the original build are past their design life. Nobody enjoys spending remodel money on mechanicals, but doing it while walls are open costs a fraction of doing it later.
Here's the surprise: these are the easiest houses in our service area to quote accurately. The framing is modern.
Plans are conventional, wiring is grounded, and the walls have no plaster, knob-and-tube or lead paint. Little is unknown, so contingencies stay small.

Second owners update the kitchens and baths in 1990s or 2000s subdivision houses, often tackling finishes at the same time. Families rework primary suites.
Some owners finish basements that were framed but never completed. Cottage owners modernize older buildings at Higgins Beach and Pine Point, as well as Prouts Neck.
Common projects include kitchens and bathrooms. Primary suites are another regular request.
Across large open plans, flooring and trim carry substantial scope. Basement finishing, window replacement and sensible mechanical swaps also come up while walls are open.
Interior work belongs on the winter calendar, which is far easier than summer. Window replacement needs milder weather and usually gets scheduled around the remaining work.
In a coastal pocket, summer itself is the constraint. Crews get harder to schedule.
Access does too.
The housing is young, which flips the usual advice. Across much of Maine, the concern is what's hidden behind the walls.
Scarborough's newer subdivisions hold fewer surprises there. The risk shifts to scope creep and selections.
A statewide fact worth having while you compare bids: Maine does not license general contractors or builders. Only plumbers and electricians hold state licenses, so there is no remodeling credential to verify. What is verifiable is insurance, references, financial stability and reputation, and our ten-step process checks all of it before we give you a name.
What do Scarborough homeowners want to know first?
Is it worth refacing cabinets instead of replacing them?
In houses of this era, often yes. The boxes are usually sound, and the money moves to counters and appliances where it shows.
Why is my great room cold at the floor and hot upstairs?
Two-story volumes stratify. When ceilings are open during a remodel it is the cheapest time to improve air sealing and rethink where heat is delivered.
Should I replace windows during a remodel?
If they are original to a 1990s build and trim is coming off anyway, it is much cheaper now than as a separate project later.
Do 1990s houses have lead paint?
No. Lead paint concerns apply to housing built before 1978, which is most of Portland and very little of subdivision Scarborough.

How do you start a Scarborough project?
Tell us the year the house was built and what's on the list. In Scarborough, that's usually enough to see the whole picture.






